Edmonton

/Edmonton

3rd Edition of Noramco Quarterly

Drive RX Cables, History of Teck Cables and Norman Fun Facts all included in this issue. Enjoy! Read the newest edition here!   http://noramcoinfrastructure.com/noramco-quarterly-1.html

2019-03-19T07:15:24-07:00March 19th, 2019|

LEVITON LOAD CENTERS………. THIS CHANGES EVERYTHING!

Leviton is changing load centers for residential applications. With easy to install, snap in breakers and easy to read fault trips on the breakers,  and aesthetically appealing design, this load centre breaks all the rules. Termination of the breakers are done at custom lugs in the panel and not at the circuit breaker. Just wire to the lug

2019-03-08T15:46:21-07:00February 22nd, 2019|Tags: , , |

Copper Trend

See below the 2019 Copper Trends. In reviewing these trends, remember that copper is normally sold as US dollars per pound and our exchange rate differences for Canada can make a significant impact on the purchasing price. There are also rod factory adders that need to be included that are not posted on the daily

2019-02-04T12:57:01-07:00January 8th, 2019|Tags: , , |

Noramco Quarterly – 02

The second edition of Noramco Quarterly is finally out! This edition will cover a wide range of topics that include: - Why a new type of Tracer Wire is better for horizontal drilling among other applications. - Commodity trends for the most common elements in the industry. - IEEE Duct Bank Calculations. - EV charging,

2018-12-07T10:04:11-07:00November 13th, 2018|

Extension Cords are Here!

  The cold weather is coming, are you ready?  Noramco has all of your extension cord needs in stock. We have you covered! Polar/Solar extension cords are 300v flexible SJEOOW construction that maintain their flexibility rated to -50C.  Pro Grade Water and Weather Resistant, Grounded, Single and Tripe Lighted Female Ends so you know they

2018-10-18T15:15:07-07:00October 18th, 2018|

Noramco Quarterly Magazine

It's finally here! The first edition of Noramco Quarterly magazine. This issue tackles topics such as the history of SPC90, some of our charitable work and what exactly happened at the Noramco Carnival. To read this edition click here: Read Quarterly #01 Now

2018-10-18T14:37:19-07:00July 27th, 2018|

Ilsco Lugs and Grounding Connectors

Noramco stocks Ilsco Lugs and Grounding Connectors.  Reduce your inventory for lugs and connectors with Ilsco products. Wider size ranges means less inventory of products for you!Complete your grounding cables with the right connector, just ask your sales representative.

2018-06-06T09:16:36-07:00June 5th, 2018|

Canadian Electrical Code Changes 2018- Download the Summary

Download Canadian Electrical Code (CEC) changes. The new Canadian Electrical Code was passed in January of this year. The Canadian Electrical Code is not law, it is a standards guide. By constitution the Provinces are responsible for electrical safety. In practice, the provinces adopt the code in whole or with minor variations. At that

2019-01-28T13:52:38-07:00May 10th, 2018|Tags: |

Top Changes to the 2018 CEC Code

The new Canadian Electrical Code was passed in January of this year. The Canadian Electrical Code is not law, it is a standards guide. By constitution the Provinces are responsible for electrical safety. In practice, the provinces adopt the code in whole or with minor variations. At that point of adoption, it becomes law in

2018-05-10T10:20:50-07:00May 10th, 2018|Tags: |