The Town North Sour Gas Plant is part of a large development plan by Petronas in the North Montney formation – part of Northeast B.C. With an estimated 1 Billion Dollar per year capital expenditure, Petronas is committed to continued development year over year.
The Wastewater Treatment Project includes a tertiary wastewater treatment plant at McLoughlin Point, Esquimalt. The treatment plant is designed to minimize visual impacts from the water and includes a multi-level green roof, mature landscaping, an observation deck, and education space.
A new 360-megawatt (MW) natural gas plant in Moose Jaw’s Agri-Food Industrial Park. The new power station will provide power for about 360,000 homes in Saskatchewan and support renewable power generation and coal retirements.
The new Edmonton Light Rail Transit (LRT) Valley Line is a 20 km extension to the existing Capital and Metro Lines. WPE performed the electrical scope of work for the light rail system and will be supplying and installing for the substation, train control, and catenary systems.
The G3 Terminal is designed to optimize grain receiving, storage and shipping while improving supply chain efficiency, food security and supporting the Canadian economy. The facility can receive up to three 150-car trains on its innovative loop track, which unload while in motion and travel back to the prairies without detaching from their locomotives.
Nestlé Canada invested $41.8 million on its Ice Cream factory in London ON increasing production capacity and resulting in 88 new jobs. The 26,000 sq ft expansion project created two new production lines to prepare for growth in the sector as well as to prepare for future growth.
for over 50 years
Products
Our Expertise
Services & Solutions
Company
24/7 Emergency:
Phone:
Corporate Address:
2268 Peardonville, Rd. Unit 155 Abbotsford, B.C V2K 6J8